Myrtle Beach Airport Terminal

 


Entranced-2o-360Castles Engineering was pleased to provide the Civil Engineering services to accompany the Myrtle Beach MYR 300 Terminal Enhancement Project.

The scope of work included but not specifically limited to the preperation of construction documents to accompny the development of long and short term parking lots and loop road for the new terminal facility. This includes all grading, drainage, striping, curb and gutter along with sidewalks.

The Myrtle Beach International Airport Terminal Capacity Expansion Project increased the number of gates from 7 to 13 with square footage increased from 155,000 in the old terminal to an estimated combined total of 389,000 square feet. The new $113.7 million terminal will took approximately two years to complete with an additional year for the renovation of the current terminal.

The airport’s new long-term parking lot opened in October and is fully functional in addition to a toll plaza for that lot. Passengers are now using the extended facility. Another component of the expansion is Harrelson Boulevard.