North Myrtle Beach Renourishment

Beach Renourish 360

The Topographical surveying services by Associated Land Surveying was essential in the beach renourishment project which pumped sand from offshore onto the beach. It has been done roughly every decade to keep the beach big enough for tourists and the coast strong enough for the high-rise buildings that line the coast.

The U.S. Army Corps of Engineers Corps of Engineers, using Great Lakes Dredge and Dock, pumped more than 3 million cubic yards of ocean floor sand onto the beach from the inlet north of Cherry Grove south to a point across from Barefoot Landing. The entire process took approximately six weeks.