843-448-0910

2024 Corporate Centre Dr., Ste. 102
Myrtle Beach, SC 29577

CCU Bioretention Basin

DSC02-R-360Castles Engineering designed Bioretention Basins at Coastal Carolina University (CCU) for their new University Boulevard Parking Areas.

These bioretention areas receive stormwater runoff from paved parking areas and are designed to filter contaminants contained in the first inch of runoff from the paved surfaces. By combining bioretention with underground storage and recharge Castles Engineering was able to provide CCU with an environmentally conscious stormwater solution while maximizing the area available for vehicle parking.